Alhandra Cement Terminal (Cimpor)
Este website utiliza cookies. Ao continuar a navegação está a aceitar a sua utilização.
Caso pretenda saber mais, consulte a nossa política de privacidade.
This is a private use terminal serving the first cement factory to be built from scratch in Portugal. Given its location it is one of the terminals in the port of Lisbon that most uses river traffic and offshore cargo handling, thus ensuring the export of clinker by river, on ships anchored offshore in Mar da Palha.
Specifications
- Area: 8,07 ha
- Storage capacity: over 430,000 ton/yr
- Quay length: 177m
- Depth: -5m HZ
Access
- Road access: access to EN10 with connection to A1
- Rail access: branch line with access to the national railway network (northern line)
- Maritime access: channel for barges
Equipment
- Bulk loading station with capacity for 300 ton/hour
50%
Solid Bulk exported through the Port of Lisbon (Cement)
3,83
Cement production installed capacity (M. tons)
Largest
User of inland waterways transport
First
Cement factory built in Portugal